Skip to content
CityAM
Main navigation
  • News
    • News
      • Latest Business News
      • Economics
      • Politics
      • Tech
      • Banking
      • FTSE 100 Live
      • Retail
      • Insurance
      • Legal
      • Property
      • Transport
      • Markets
    • From our partners
      • AON
      • Bayes Business School
      • Canada BIDs
      • Central London Alliance CIC
      • Destination City
      • Halkin
      • Olympia
      • Inside Saudi
      • Tottenham Hotspur Stadium
      • Santander X
      • YEAR SIX Dividend
    • Featured

      Prem Rugby needs to switch up its calendar to stop final being banished to fringes

      GettyImages 2220159051 showing a significant news event with key figures discussing major topics in a formal setting

      Submit a story

      Tell us your story.

      Submit
  • Opinion
  • Sport
    • Latest Sports News
      • Sport
      • Sport Business
    • From our partners
      • The Morning Briefing: SBS x CityAM
      • Aramco Team Series
      • LIV Golf
    • Featured

      Prem Rugby needs to switch up its calendar to stop final being banished to fringes

      GettyImages 2220159051 showing a significant news event with key figures discussing major topics in a formal setting

      Submit a story

      Tell us your story.

      Submit
  • Life&Style
    • Life&Style
      • Life&Style
      • Toast the City Awards
      • The Magazine
      • Travel
      • Culture
      • Motoring
      • Wellness
      • The RED BULLETiN
      • Do it with Shared Ownership
      • Media Speak Hub
    • Featured

      VW Golf R 2026 long-term review: Final verdict on a classic hot hatch

      Volkswagen Golf parked on a city street showcasing sleek design and modern features in an urban environment

      Submit a story

      Tell us your story.

      Submit
  • Investec
  • Events
  • Latest Paper
Thursday 05 September 2019 4:20 am

HS2 needs a radical rethink to give Britain better connectivity – CityAM : CityAM

HS2 has never had an easy ride. Fiercely opposed from the beginning by MPs from all parties, it has been lucky to survive up until now. Following the news this week that its budget is to increase by another £22bn and it will delayed by seven years, the prognosis looks terminal.Clearly, HS2 should not go ahead in its current iteration. To scrap the entire project now, however, would be a huge mistake. Instead, HS2 should be significantly rescoped and focused on solving the problems it was set up as the answer to: to bring capacity to the UK rail network where it is most needed.The current iteration of HS2 misses this point entirely. By drawing passenger services away from the West Coast Main Line, it will in fact make rail travel worse for many of those who currently use the existing route, while creating new capacity where there is no particularly strong demand for it.To see evidence of what this looks like in practice, consider what happened when HS1 was introduced in 2009. This saw fast services between London and Ashford axed, with passengers left with the choice of either accepting a large increase in journey time, or paying a significant premium to travel on HS1.HS2’s victims will be in places like Stoke, Coventry and Wigan, as their existing fast services to London disappear, to make way for transporting goods up and down the country.So, I hear you ask, what should the alternative be? The first thing the Prime Minister should commit to is scrapping Phase 1, which runs between London and Birmingham. Far more London-Birmingham connectivity can be achieved by redirecting funds to improving the Chiltern Main Line – a popular and well-run existing route that has the potential to expand.Significant savings would also be made from not having to tear up large parts of the Chilterns to accommodate the new line. But in contrast to Phase 1, Phase 2 of the project should definitely go ahead. This part of the route has far more of a business case, as improving links between Birmingham, Manchester and Leeds will be crucial to building up connectivity in the north.To further augment this connectivity, funds from Phase 1 should be diverted to the Northern Powerhouse Rail – the scheme linking Liverpool, Manchester, Leeds, Sheffield and Hull. The government has already indicated tentative support for this, which should be welcomed.Done together, HS2 Phase 2 and Northern Powerhouse Rail will create a conglomeration effect across the north of England, helping disparate towns and cities become more of the sum of their parts – and enabling the region to emerge as an economic competitor to London.Packaging this up and selling it to MPs and other stakeholders won’t be easy for the government, especially for those fully committed to the current plans. But if HS2 is to make any return on investment, they will need to consider a radically different option to what’s currently on the table.Main image: Getty

Share this article

  • Facebook
  • X
  • LinkedIn
  • WhatsApp
  • Email

Similarly tagged content:

Categories

  • CityAM Content

Trending Articles

  • As it happened: Stocks sink after Fed and Bank of England opt for hawkish hold; Oil price tumbles

  • More Big Four blues as Deloitte plans to slash UK audit roles

  • Baillie Gifford in line for Anthropic windfall just months after £3.6bn SpaceX bonanza

  • Revolut pays compensation for waking customer up with push notifications

  • City investors raise alarm on Burnham’s Chancellor pick

More from CityAM

  • New HS2 budget to blow £33bn hole in public finances

    Transport & Infrastructure
    HS2 construction worker inspecting tunnel progress, showcasing infrastructure development and engineering expertise
  • ‘Obscene’ – HS2 on track to cost at least £102bn as minister slams ‘gold-plated folly’

    Transport & Infrastructure
    HS2 construction progress at Birmingham station with cranes and workers, highlighting UKs high-speed rail project development
  • Upgrading the grid risks ending up like HS2

    Opinion
    Electricity grid infrastructure with high-voltage power lines and pylons under a clear sky, representing energy distribution.
  • Time to network the rail

    Opinion
    Kings Cross Coal Drops Yard bustling with shoppers and visitors amidst modern architecture and vibrant store displays
  • Labour has not delivered on planning reform, manufacturers say

    Industrials
    Rachel Reeves at construction site, inspecting housebuilding progress, highlighting Labours commitment to housing developm...
  • No, London’s economy hasn’t lost its lustre. Here’s why

    Opinion
    GettyImages 2244121938 displaying a professional business meeting with diverse executives discussing strategic plans in a ...
  • Balfour Beatty emerges from US oversight scheme after fraud against military

    Transport & Infrastructure
    Balfour Beatty construction site showcasing cranes, workers, and building progress against a city skyline backdrop
  • London local elections 2026: Who will win in the borough of Camden?

    London
    Voters in London casting ballots at a polling station during local elections, highlighting civic engagement and democratic...

CityAM Canada — business, markets and opinion for Canadian readers.

Sections

  • Business
  • Markets
  • Tech
  • AI
  • Economics
  • Opinion
  • Cities

Company

  • About
  • Contact

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
© 2026 CityAM Canada. All rights reserved.
Terms · Privacy · Cookies