Skip to content
CityAM
Main navigation
  • News
    • News
      • Latest Business News
      • Economics
      • Politics
      • Tech
      • Banking
      • FTSE 100 Live
      • Retail
      • Insurance
      • Legal
      • Property
      • Transport
      • Markets
    • From our partners
      • AON
      • Bayes Business School
      • Canada BIDs
      • Central London Alliance CIC
      • Destination City
      • Halkin
      • Olympia
      • Inside Saudi
      • Tottenham Hotspur Stadium
      • Santander X
      • YEAR SIX Dividend
    • Featured

      ‘Very concerned’: City watchdog scolds motor finance lenders over £9bn redress scheme

      FCA sign

      Submit a story

      Tell us your story.

      Submit
  • Opinion
  • Sport
    • Latest Sports News
      • Sport
      • Sport Business
    • From our partners
      • The Morning Briefing: SBS x CityAM
      • Aramco Team Series
      • LIV Golf
    • Featured

      Dallas, Boston, New York New Jersey: Inside England’s Fifa World Cup stadiums

      Getty Images logo against a sleek, modern background, representing the influence of media in the business world

      Submit a story

      Tell us your story.

      Submit
  • Life&Style
    • Life&Style
      • Life&Style
      • Toast the City Awards
      • The Magazine
      • Travel
      • Culture
      • Motoring
      • Wellness
      • The RED BULLETiN
      • Do it with Shared Ownership
      • Media Speak Hub
    • Featured

      Glengarry Glen Ross at the Old Vic fails to close

      Glengarry Glen Ross production at Old Vic Theatre showcasing intense business negotiations and dramatic performances

      Submit a story

      Tell us your story.

      Submit
  • Investec
  • Events
  • Latest Paper
Friday 12 June 2015 1:53 am

Investigation launched into Network Rail reliability after delays and cost overruns

By: Ashley Kirk

Add as a preferred source on Google

Network Rail is to be investigated by Britain's rail regulator after it was accused of delivering poor punctuality and reliability on some of its key routes. 

The routes, some of which are the busiest commuter routes in the country, were "below requirements", according to the regulator, the Office of Road and Rail (ORR). 

They are operated by Southern, Thameslink and ScotRail. 

This will come as no massive surprise to commuters travelling into London Bridge, which has been thrown into chaos by long-term refurbishment, as well engineering works at King's Cross and Paddington causing major delays over the Christmas period. 

Facing cost overruns and problems with reliability, Network Rail defended its network, saying it was the "safest in Europe", while acknowledging there were "opportunities to improve".

Read more: Network Rail profits halve as company admits it is not keeping up with pace of change

The ORR said that 89.6 per cent of trains were on time – less than the 92.5 per cent target. It did acknowledge, however, that Network Rail has had to deal with increased demand – with passenger journeys increasing by 59.1 per cent since 2005. 

Chief executive Richard Price stated that it was investigating the firm's "performance improvement plans and delivery of enhancements".

Network Rail said:

There are clearly opportunities to improve following decades of under investment in the rail network. However, it is worth highlighting that we operate the safest passenger network in Europe and the railway asset reliability is the best it has ever been.

The increase in passengers means that more people are getting to their destination on time than ever before.

Transport secretary Patrick McLoughlin said:

I expect the regulator to hold Network Rail to account, performance must and should improve. The industry has to work together to address these failings and deliver for passengers and the economy, that needs to start now.

Share this article

  • Facebook
  • X
  • LinkedIn
  • WhatsApp
  • Email

Similarly tagged content:

Sections

  • News

Categories

  • Business
  • Transport & Infrastructure

Related Topics

  • Network Rail
  • Travel delays and disruption

Trending Articles

  • Who could be Andy Burnham’s Chancellor? 

  • As it happened: FTSE 100 finishes higher as US-Iran talks progress and Starmer resigns; Space X shares fall after bond sale

  • Starmer will resign, Trump says

  • Coca-Cola brings in restructuring lineup over failed Costa sale

  • Ocado to replace founder Steiner as shares plunge 

More from CityAM

  • Balfour Beatty emerges from US oversight scheme after fraud against military

    Transport & Infrastructure
    Balfour Beatty construction site showcasing cranes, workers, and building progress against a city skyline backdrop
  • GRIDSERVE Reports 45% YoY Growth, as UK’s Most-Used Charging Network Proves the Commercial Case for EV Infrastructure at Scale

    Business Wire
  • Natwest to pump £50m into branches after shuttering over a thousand

    Banking
    NatWest bank front entrance with logo and signage on urban street, highlighting financial institution presence in the city.
  • ‘Dire’: Rapid decline in construction as sector slashes jobs

    Economics
    Construction workers building a residential complex, symbolizing Labours push for renters rights legislation
  • XFolio AI Acquires Absolute Payment Solutions to Unify Treasury and Payments for UK Corporates

    Business Wire
  • Assurant’s 2026 Global Connected Consumer Trends Report Finds That as Connected Tech Becomes More Critical, Reliability, Support, and Transparency Matter More Than Ever

    Business Wire
  • Top Summer Destinations 2026 Revealed by Leading Travel Agent Opodo

    Business Wire
  • Heathrow slams regulator plans to ‘take UK backwards’ by slashing investment

    Transport & Infrastructure
    Heathrow Airport's expansion was estimated to cost up to £62bn as of last year.

CityAM Canada — business, markets and opinion for Canadian readers.

Sections

  • Business
  • Markets
  • Tech
  • AI
  • Economics
  • Opinion
  • Cities

Company

  • About
  • Contact

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
© 2026 CityAM Canada. All rights reserved.
Terms · Privacy · Cookies